Jan. 16th, 2017

fiberaddict: (Default)
The cabinets will be installed Feb. 1 and 2. Let me repeat that: I should have a fully functional kitchen Feb.2!!!!!!!!!!!

I don't think I have enough exclamation points...:lol:

I need to take photos.....and get them posted. Right now, though, I want to happy dance all over the empty house.

Profile

fiberaddict: (Default)
fiberaddict

August 2017

S M T W T F S
  12 345
6789101112
1314 1516171819
20212223242526
2728293031  

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated Aug. 21st, 2017 04:47 am
Powered by Dreamwidth Studios