Apr. 17th, 2017

fiberaddict: (Default)
The tub surround is almost finished! Just needs grout - which SG is supposedly doing right now. :happy dance: It took all weekend, but it's DONE.

And it's MARBLE. I didn't realize that when we bought the tile - I just saw some pretty, pretty greenish tiles. It was about $200 more than the kids' bathroom; I figured it was because we went with the over-sized subway tiles (rectangular; I think they're 6" x 12". ) The green looks good with the burgundy walls.

Now we wait on the floor guys to come and install the flooring.....

I also finished the edges of my cutting table - I used 2 cans of the spray-on plastic dip (normally used for tools). It smelled, but I now have a nice finish.

It's overcast here, and slightly cool. I need to get to the Studio to do some sewing, but I am unmotivated at the moment. I need to get some new work out pants made up.........:sigh:

Ah, well - onward! There's a lot of grumbling coming from the bathroom.....I'm avoiding it. :lol:

Profile

fiberaddict: (Default)
fiberaddict

September 2017

S M T W T F S
      12
3 456789
10111213141516
1718192021 2223
24252627282930

Most Popular Tags

Page Summary

Style Credit

Expand Cut Tags

No cut tags
Page generated Oct. 17th, 2017 01:13 pm
Powered by Dreamwidth Studios